School Washroom Case Study

Rothley Primary School: Classroom Toilet Upgrade
Timeline: Summer holidays - 3 weeks)
Scope: Refurbishment of 3 classroom washrooms

Three tired pupil school washrooms were set for a like-for-like swap this summer, but the Macaw team spotted the real culprit: a flimsy cubicle frame that made every door wobble and every hinge work loose. Simply replacing boards would have baked the problem back in.

Instead, we rebuilt the structure. Partition panels were taken higher and tied into concealed steel bracing, giving the cubicles the rigidity of a brick wall while keeping them light and child-friendly. Doors now close with a soft “click”, not a crash.

We clad everything in bright, anti-bacterial Polyrey laminate that laughs off marker pens and bleach alike and colour-matched the school’s house system. Soft-close hinges and tamperproof locks cut noise and maintenance calls.

Timing was critical. Our DBS-checked crew stripped out, first-fixed and fitted all three washrooms in three weeks flat—finishing a full fortnight before the new term. Teachers returned to a spotless site; pupils returned to washrooms that feel solid, safe and fresh.

man on beach

“Macaw didnʼt just replace fixtures; they tackled the root causes. The rooms are dry, bright and incredibly easy to look after. Staff and pupils love them.ˮ

Craig Palmer, Estates Manager

childrens toilet cubicles
childrens toilet cubicles
Hallpark Academy washrooms
Hallpark Academy Washrooms installed by Macaw
Eastwood washroom installation
recent sink installation
Secondary school installation in Eastwood

Hall Park Academy, Eastwood, Nottingham

Project Overview: Macaw Washrooms transformed a tired and outdated girls' toilet facility at Hall Park Academy in Eastwood, Nottingham, creating a modern, spacious, and secure washroom environment designed to handle high-volume student traffic efficiently.

Design Innovation

The project involved significant structural modifications to improve both functionality and supervision in secondary school washrooms:

  • Removal of front elevation to provide clear sightlines for staff supervision
  • Demolition of central structural wall to create one expansive toilet area
  • Installation of structural beam to support roof modifications
  • Creation of wider openings to improve traffic flow during peak times and breaks
  • Removal of existing brick walls between cubicles
  • Reconfiguration enabled creation of an additional cubicle plus cleaner's cupboard

Key Features Installed

Cubicles

  • 13mm solid grade laminate cubicles in Chen Argent finish by Polyrey
  • Installation of preformed IPS system with removeable panels for access and maintenance

Flooring & Wall Systems

  • Polysafe cap and cove flooring in Twilight pastel grey
  • Hygienic wall cladding throughout
  • Colour scheme selected to create a more inviting environment

 

Water & Drainage Systems

  • Localised water heaters installed under vanities to eliminate legionella risk
  • New drainage infrastructure to accommodate increased toilet provision
  • Non-concussive water-saving taps
  • Pneumatic vandal-proof flush buttons with fast-fill regulated systems for peak usage

Safety & Security Features

  • Electric vape detection alarms with warning system
  • Anti-vandal ceiling throughout
  • Enhanced supervision capabilities through improved sightlines

Environmental Systems

  • New extraction systems in every cubicle and common areas
  • Energy-saving LED lighting on PIR sensors
  • Economic hand dryers

Project Outcome This comprehensive refurbishment has transformed Hall Park Academy's facilities from outdated and problematic to modern, efficient, and secure. The innovative design maximises space utilisation whilst improving student safety and supervision. The robust, vandal-resistant specifications ensure longevity in this high-traffic educational environment.

Our school Hall Park Academy are pleased to share our thoughts on the newly refurbished school toilets, which have made a noticeable difference to the overall environment and student experience. The refurbishment has brought a fresh, modern look to the facilities. The new layout is more spacious and better ventilated, which has significantly improved hygiene and comfort. The addition of  hand dryers, and improved lighting has made the space more user-friendly and energy-efficient.

Students have commented positively on the brighter colours, cleaner appearance, and increased privacy. The new cubicles and doors offer better security and comfort, and the anti-vandal fittings are a smart addition for long-term durability. From a site management perspective, the materials used are clearly chosen for ease of maintenance and cleaning, which helps us keep the facilities in top condition with less effort.

Overall, the refurbishment has been a great success and has had a positive impact on both staff and students. It reflects a strong commitment to providing a safe, clean, and respectful environment for everyone in the school community. We would strongly recommend Macaw washrooms to help design your project and deliver the project within a desired time to a high quality .ˮ

Gary Annable, Site Manager - Hall Park Academy

Contact Macaw Washrooms Today










    Why Contact Macaw Washrooms?

    Get in touch to discuss your specific situation. We've worked with enough schools, parks, retailers, offices and clubs to understand what you're really dealing with.

    Commercial Washroom Case Study

    Premier Paper
    Scope: Refurbishment of office washrooms

    Macaw’s Signature Range proved the perfect match for this prestige staff washroom upgrade. Chêne Colorado cubicles create a warm timber aesthetic, set off by anthracite designer radiators that add a contemporary edge while guaranteeing steady comfort. Hard-wearing Karndean planks harmonise with the woodgrain and handle heavy footfall with ease. An Isomi concealed-envelope wash-trough hides pipework and stores consumables, keeping surfaces uncluttered.

    Verona back-to-wall pans with soft-close seats pair with Delabie soft-close, non-concussive taps to save water and eliminate bangs. Walls are wrapped in Perform Panel’s Dandywood Harmony cladding; its Aqua-Lock joints deliver a seamless, hygienic finish without visible trims. Delivered on a turnkey basis, the project finished five days ahead of schedule and has transformed a tired facility into a showpiece. All end users are delighted. Nigel Beesley, Facilities Manager, says, “Macaw’s attention to detail and premium materials have given us a washroom that genuinely impresses staff and visitors alike.”

    sink and hand dryer
    toilet cubicle

    Gardner Aerospace Case Study

    Project Overview

    Macaw Washrooms completed a washroom reconfiguration project for Gardner Aerospace in Derby, a leading aerospace manufacturing company and part of the Ligeance Aerospace Technology group.

    The Challenge

    With a growing workforce, the existing washroom facilities were no longer fit for purpose. The client needed to increase the number of cubicles and urinals whilst delivering a fresh, practical update suited to a high-traffic canteen environment within a busy manufacturing site.

    What We Did

    To maximise the available space, we converted the former ladies’ washroom into the new male facility, taking advantage of its larger footprint. The room was reconfigured 180 degrees, allowing for an additional toilet and two urinals, with new drainage and water feeds installed throughout. The new ladies’ washroom was fitted with three cubicles and a dedicated storage area for cleaning products.

    The Result

    A smart, practical solution that increased capacity for a growing aerospace workforce without the need for costly building work. Both washrooms now comfortably serve a busy manufacturing environment — clean, functional, and built to handle the demand.

    Oaks in Charnwood Case Study

    Project Overview

    Macaw Washrooms completed Phase 2 of an ongoing washroom refurbishment project at The Oaks Scout Campsite, set within the ancient Charnwood Forest in northern Leicestershire. The campsite welcomes over 400 visitors during weekend camps, with constant use throughout the summer months from Rainbows, Brownies, Rangers, Squirrels, Beavers, Scouts, and Explorers.

    The Challenge

    The existing toilet block was dated and in need of modernisation. While the campsite is a beautiful, warm setting in summer, the facilities face harsh conditions during winter — cold, wet, and isolated. The project needed to be completed within tight timescales during the winter months, adding further complexity to the work.

    What We Did

    Working within the challenging winter conditions, our team delivered a comprehensive refurbishment designed to withstand the demands of a busy campsite environment. Water temperature controls were installed for safe use by young visitors. Frost protection and pipe lagging were fitted throughout to safeguard pipework during the cold winter months, along with individual isolation valves allowing specific appliances to be shut off independently in an emergency. Walls were over-clad with hygienic UPVC cladding for durability and easy cleaning. Non-concussive taps were fitted to reduce water waste, and new pneumatic flush buttons were installed delivering an efficient 5-litre flush. Three additional urinals were added to meet demand, and anti-slip flooring was laid throughout for safety. Colours were chosen to represent The Oaks campsite identity.

    The Result

    A modern, hard-wearing washroom facility built to handle the demands of hundreds of young visitors each weekend, whilst standing up to the harsh winter conditions of an isolated woodland campsite. Phase 2 continues Macaw Washrooms’ ongoing partnership with The Oaks, delivering facilities that are safe, hygienic, and fit for purpose all year round.

    Lapstone Barn Case Study

    Project Overview

    Nestled on the edge of the picturesque tourist village of Chipping Campden in the heart of the Cotswolds, Lapstone Barn offers a stunning setting for the perfect wedding day.

    The Challenge

    Originally fitted in 2018, the washroom facilities had hosted an average of 150 weddings a year — and the wear was starting to show. With that volume of guests passing through, cubicle dividers, doors, and fixtures had shifted out of alignment and needed attention to keep the facilities matching the quality of the venue.

    What We Did

    Our on-site team carried out a full realignment of dividers, pilasters, and cubicle doors, along with repositioning of all locks and keeps to ensure smooth, reliable operation.

    The Result

    With new fixings and careful workmanship throughout, the washroom facilities are restored and ready to welcome guests for years to come — keeping the experience as polished as the venue itself.

    School Washroom Case Study

    Blakesley CofE Primary School
    Timeline: Summer holidays (3 weeks)
    Scope: Refurbishment of classroom washrooms and reception

    The Key Stage 1 washrooms in this 19th-century village school were charmingly old-fashioned —right down to “Jurassicˮ cast-iron pipework, rattling sash vents and cracked quarry tiles. Charm, however, doesnʼt mop up condensation or meet modern safeguarding standards. Macaw delivered a full turnkey refurbishment that solved todayʼs problems while respecting the buildingʼs character

    Healthy air, happy kids: we re-engineered ventilation with low-noise extract fans and ducting discreetly threaded through attic voids, ending decades of damp. Future-proof services: obsolete pipework was replaced with insulated copper feeds, point-of-use water heaters and non-concussive, water-saving taps.

    Robust, bright interiors: slip-resistant safety flooring, wipe-clean uPVC cladding and colouraccent feature walls stand up to daily hard knocks. Splash-shaped mirrors add fun; energyefficient hand-dryers speed the turnaround between lessons. Child-centred layout: we removed a little-used urinal run to create an extra cubicle, fitted low-height doors with friendly thumbturn locks and used soft-close hardware throughout.

    washroom before rennovations
    sink